Current Major Project Status projects

The following projects currently hold Major Project Status and are receiving assistance from the MPFA in navigating their major Australian Government approvals. Project locations are shown marked on the map above.

Map legend Project name Project proponent Description State / Territory Major Project Status granted Major Project Status expires
1

Ammaroo Phosphate Project

Verdant Minerals Pty Ltd

The Ammaroo Phosphate Project is a two-stage development: Stage 1 involves a phosphate rock and extraction open cut mine at the Ammaroo deposit and a beneficiation and chemical plant complex built on the Ammaroo mining leases. Stage 2 will see the development of a value-added processing facility designed to produce granulated fertilisers for use within Australia and for export to targeted markets in Asia.

The Project has a projected capital expenditure of $3.5 billion and would create about 250 construction jobs and 375 ongoing jobs per annum.

Verdant Minerals Pty Ltd

NT

20 Febt 2024

20 Feb 2027

2

Australia-Asia Power Link (AAPowerLink)

SunCable Holdings Pty Ltd

AAPowerLink includes three components: a 10-gigawatt solar farm array built over 12,000 hectares in the Barkly region near Tennant Creek, battery storage facilities in Darwin and Singapore and a high voltage direct current transmission line between the solar farm and the Darwin Harbour. The project would link to Singapore’s electricity grid and have the potential to significantly expand the renewable energy and battery storage industries in Australia.

The Project has a projected capital expenditure of $60 billion and would create about 1,750 construction jobs and 350 ongoing jobs per annum.

SunCable Holdings Pty Ltd

NT

14 July 2020

14 Jan 2024**

Renewal under assessment

3 Australian Renewable Energy Hub (AREH) Australian Renewable Energy Hub Pty Ltd – with bp Alternative Energy Australia Pty Ltd (‘bp Australia’) as Operator

AREH involves a green hydrogen and ammonia production facility. The Project includes a 26-gigawatt hybrid wind and solar power plant that aims to produce at export scale while supplying industries in the Pilbara and Broome Region. 

The Project has a projected capital expenditure of $30 billion and would create about 3,000 ongoing jobs per annum.

Australian Renewable Energy Hub Pty Ltd with bp Australia as operator

WA

22 May 2024

22 May 2027

4

Battery Anode Material Facility

EcoGraf Limited

The Battery Anode Material Facility is a proposed processing facility located in the Kwinana Strategic Industrial Area in south-west Western Australia focussed on producing high purity spherical graphite for direct supply to battery anode manufacturers overseas. The Project would be developed in stages, with an a projected fill production capacity of 20,000 tonnes per annum.

The Project has a projected capital expenditure of $0.107 billion and would create about 200 construction jobs and 61 ongoing jobsper annum.

EcoGraf Limited

WA

23 Feb 2021

23 Feb 2024**

Renewal under assessment

5 Broken Hill Cobalt Project Cobalt Blue Holdings Limited

The Broken Hill Cobalt Project aims to produce high purity cobalt sulphate from a large cobalt deposit near Broken Hill, NSW, for use in the manufacture of lithium ion batteries globally. The Project also aims to produce elemental sulphur, a key ingredient in fertiliser production, to help reduce Australia’s dependence on fertiliser imports.

The Project has a projected capital expenditure of $0.56 billion and would create about 450 construction jobs and 410 ongoing jobs per annum.

Cobalt Blue Holdings Limited

NSW 24 Feb 2022 24 Feb 2025
6

Finniss Lithium Project

Core Lithium

The Finniss Lithium Project, 25km south-west of Darwin Port in the Northern Territory, proposes an open pit and underground lithium deposit, and a dense media separation processing plant. The Project would be the first Lithium plant outside Western Australia and is expected to produce 175,000 tonnes per annum of spodumene concentrate over a minimum seven-year mine life.

The project has a projected capital expenditure of $0.073 billion and would create about 360 construction jobs and 250 ongoing jobs per annum.

Core Lithium

NT

23 Feb 2021

23 Feb 2024**

Renewal under assessment

7

Goschen Rare Earth Mineral Sands Project

VHM Limited

The Goschen Rare Earths Mineral Sands Project involves an integrated critical minerals mining and processing asset in Victoria’s Loddon Mallee Region. The Project aims to develop a combination of rare earth oxide products, mixed heavy rare earth carbonate concentrates, and zirconium and titanium minerals.

The Project has a projected capital expenditure of $0.606 billion and would create about 250 construction jobs and 400 ongoing jobs per annum.

VHM Limited

VIC

25 Mar 2021

25 Mar 2024**

Renewal under assessment

8 Hawsons Iron Project Hawsons Iron Ltd 

The Hawsons Iron Project aims to establish a green field magnetite mine near Broken Hill, NSW, to produce high-grade magnetite concentrate for low-emissions steel manufacturing.

The Project has a projected capital expenditure of $1.9 billion and will create about 1,200 construction jobs and 500 ongoing jobs over the 20-year operating period. 

Hawsons Iron Ltd

 NSW  7 Apr 2022  7 Apr 2025
9 High Purity Alumina Project (HPA Project) Cadoux Limited

The HPA Project aims to produce high purity alumina from a processing plant located in Kwinana, Westersn Australia, for use in growth tech applications. High purity alumina is sought after for its corrosion and scratch resistance and its ability to withstand extreme temperatures. The processing plant will use kaolin mined from a deposit near Cadoux as feedstock.

The Project has a projected capital expenditure of $0.27 billion and would create about 200 construction jobs and 228 ongoing jobs per annum.

Cadoux Limited

WA

25 May 2021

25 May 2024**

Renewal under assessment
10

Ichthys Liquefied Natural Gas Project (Ichthys LNG)

– Phase 2

INPEX Operations Australia Pty Ltd

Phase 2 of Ichthys LNG expands on the infrastructure developed in Phase 1 to support a LNG production chain spanning the Browse Basin off the Western Australia coastline and Bladin Point in the Northern Territory. The production chain includes an offshore central processing facility and a floating production, storage and offtake facility connected to an onshore processing plant through a 890km-long gas export pipeline. Phase 2 of the Project involves modifications to these facilities and the installation of subsea infrastructure to support the drilling of additional wells. At full capacity, the Project is expected to produce 8.9 million tonnes of LNG per annum.

Phase 2 of the Project has a projected capital expenditure of $14.2 billion, and, combined with phase one, is supporting about 1,800 jobs per year over the project’s 40-year life.

INPEX Operations Australia Pty Ltd

WA 11 Nov 2021 11 Nov 2024
11 Kalgoorlie Nickel Project Ardea Resources Limited

The Kalgoorlie Nickel Project involves mining and processing ore into high quality cobalt and nickel Mixed Hydroxide Precipitate for use in the manufacture of lithium-ion batteries globally. This would support the production of a range of emerging clean energy technologies, including electric vehicles. The Project is located 75 km north of the Kalgoorlie-Boulder mining centre, within the Eastern Goldfields region of Western Australia.

The Project has a projected capital expenditure of $1.165 billion and would create about 1,500 construction jobs and 300 ongoing jobs per annum.

Ardea Resources Limited

WA 16 Mar 2022 16 Mar 2025
12 NiWest Nickel Cobalt Project Alliance Nickel Limited

The NiWest Project aims to produce high purity nickel and cobalt sulphate products from large nickel-cobalt deposits located in the West Australian Nickel belt. Once operational, the project is expected to produce 90,000 tonnes of nickel sulphate and 7,000 tonnes of cobalt sulphate annually for use in the manufacture of electric vehicle batteries.

The Project has a projected capital expenditure of $1.26 billion and would create about 600 construction jobs and 438 ongoing jobs per annum.

Alliance Nickel Limited

WA 1 May 2024 1 May 2027
13 Project Haber Strike Energy Limited

Project Haber, located near Geraldton in Western Australia’s Mid-West Region, aims to produce up to 1.4 million tonnes per annum of urea for use in domestic and international fertiliser production. Natural gas and green hydrogen would be used in the manufacturing process.

The Project has a projected capital expenditure of $3 billion and would create about 1,135 construction jobs and 200 ongoing jobs per annum.

Strike Energy Limited

WA 28 Jan 2022 28 Jan 2025
14  Project Koete 

Fibre Expressway Pty Ltd 

Project Koete involves establishing three Tier IV data centre platforms in Perth, Dampier and Darwin to support digital connectivity across regional and remote Western Australia and the Northern Territory. The Project also aims to provide safe and scalable back-up data hubs for global multi-national corporations with operations in the Asia-Pacific region. The data centres would be connected by an 11,000km subsea telecommunications cable system comprising 16 fibre pairs providing domestic connectivity between Perth and Darwin and international connectivity between Perth and Malaysia, via Jakarta and Singapore. 

The Project has a projected capital expenditure of $1.5 billion and would create about 3,000 construction jobs and 1,000 ongoing jobs over the 20-year project life. 

Fibre Expressway Pty Ltd 

 WA/NT  4 Apr 2022 4 Apr 2025
15 Seadragon Project Flotation Energy Pty Ltd

The Seadragon offshore wind farm is a proposed project by Flotation Energy Pty Ltd to construct an offshore wind farm in Commonwealth waters off the coast of Ninety Mile Beach, which will connect into Victoria’s electricity network. The proposal includes up to 150 wind turbines and a network of subsea cables, with an indicative generation capacity of 1.5 gigawatts.

The Project has a projected capital expenditure of $6.5 billion and would create about 1600 construction jobs and 200 ongoing jobs over 35 years.

Flotation Energy Pty Ltd

VIC 24 Oct 2023 24 Oct 2026
16 Siviour Graphite Project Renascor Resources Limited

The Siviour Graphite Project proposes an integrated graphite mine and battery anode material operation with a mine and concentrator located in South Australia's Eyre Peninsula, and a downstream purified spherical graphite manufacturing facility located in Port Adelaide. The Project would contribute to the global battery industry and electric vehicle markets.

The Project has a projected capital expenditure of $0.208 billion and would create about 100 construction jobs and 200 ongoing jobs per annum.

Renascor Resources Limited

 SA  8 Sept 2021 8 Sept 2024
17 Star of the South Offshore Wind Farm Star of the South Wind Farm Pty Ltd

The Star of the South Offshore Wind Farm Project, located off the Gippsland coast of Victoria, aims to be Australia’s first offshore wind project. When fully operational, the Project is expected to supply up to 2.2 gigawatts of renewable energy to the National Electricity Market, contributing up to 20 percent of Victoria’s electricity.

The Project comprises both offshore and onshore assets, including wind turbines, substation and platforms, a network of subsea cables, underground and overhead powerlines, and modified ports.

The Project has a projected capital expenditure of $8.7 billion and would create about 2,280 construction jobs and 300 ongoing jobs per annum.

Star of the South Wind Farm Pty Ltd

VIC 14 Nov 2022 14 Nov 2025
18

Sunrise Battery Materials Complex

Sunrise Energy Metals Limited

The Sunrise Battery Materials Complex, located near Parkes in New South Wales, involves mining nickel and cobalt along with the rare alloying metal scandium, to produce high-purity sulphates for the rapidly expanding lithium-ion battery market. At full capacity the Project is expected to produce 25,000 of nickel and 7000 tonnes of cobalt per annum as high-purity sulphates for direct supply to battery manufacturers in Asia, Europe and America.

The Project has a projected capital expenditure of $2.609 billion and would create about 1,700 construction jobs and 380 ongoing jobs per annum.

Sunrise Energy Metals Limited

NSW 11 Nov 2021 11 Nov 2024

 

Projected capital expenditure, construction jobs and ongoing jobs figures provided by project proponents.